Lake Dreamland
In the Southeastern Regional Transmission Plan, “Cane Run Sw - Lake Dreamland 138 kV transmission lines 1 and 2, uprate”.
Described as new. The quoted wording calls this substation new. “from Cane Run Switching to the new Lake Dreamland 138 kV station” — SERTP 2025 Regional Transmission Plan and Input Assumptions, p.58
Also mentioned: “from Cane Run Switching to the new Lake Dreamland 138 kV station” — SERTP 2025 Regional Transmission Plan and Input Assumptions, p.59
Note. Printed in the LG&E/KU balancing authority section of the SERTP 2025 Regional Transmission Plan as the end point of two uprate projects (2.04 miles of bundled 795 ACSR 138 kV conductor each, from Cane Run Switching; in service 2027 as printed for the uprates). The plan gives no in-service date for the station itself and no county; none of the Kentucky PSC cases read here names it.
The case documents print no county for this substation, and none has been found printed for it elsewhere yet.
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.