South Henderson Switching Station
In a case before the Kentucky Public Service Commission, “South Henderson 161 kV transmission line (service to Pratt's Henderson paper mill)” (case 2022-00012). The station's utility: Big Rivers Electric.
Described as new. The quoted wording calls this substation proposed or future. “the proposed South Henderson Switching Station (Project B), to be located on Toy Anthoston Road in Henderson County” — Commission final order, Case 2022-00012, p.4 (case 2022-00012)
Also printed as: South Henderson
Also mentioned: “Project B consists of construction of a 161 kV switching station to be known as the South Henderson Switching Station.” — Commission final order, Case 2022-00012, p.6 (case 2022-00012)
Note. The order says the switching station provides a 161 kV line terminal for new transmission service to Pratt and re-terminates the existing 161 kV lines at the Reid-Henderson-HMP&L Tap (serving BREC Reid, BREC Henderson County and HMP&L substations), on an expandable footprint for future 161 kV and 69 kV facilities. Estimated cost $6,070,000.
Note. The Commission granted the CPCN on 2022-06-06 and found a CPCN was required for the switching station and the substation.
County: “the proposed South Henderson Switching Station (Project B), to be located on Toy Anthoston Road in Henderson County” — Commission final order, Case 2022-00012, p.4 (case 2022-00012).
Generation interconnection requests filed in Henderson, KY: PJM queue, 0 active of 1 · MISO queue, 6 active of 23 · LG&E and KU queue, 0 active of 4. Same county, not the same substation.
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.