Venator
In a case before the Kentucky Public Service Commission, “Venator Substation Project (service to TeraWulf's Muskie Data Campus)” (case 2026-00324). The station's utility: Kentucky Power.
Described as new. The quoted wording calls this substation new. “The Venator Substation Project includes the construction of a new 765/345 kV substation in Boyd County, Kentucky.” — Kentucky Power application, Case 2026-00324, p.11 (case 2026-00324)
Also printed as: Venator Substation Project
Also mentioned: “The Venator Substation Project requires creating a new 765/345kV substation” — Kentucky Power, direct testimony of Nicolas C. Koehler, Case 2026-00324, p.5 (case 2026-00324)
Note. The application says the substation is necessary to accommodate the TeraWulf interconnection request for new 345kV service at its proposed Muskie Data Campus, with a peak demand at this delivery point of approximately 1000 MW, and that the existing local 138kV and 69kV system is inadequate to serve it.
Note. The application puts the total estimated cost at approximately $285 million and asks for a CPCN no later than March 1, 2027. The Koehler testimony says Kentucky Power will seek a separate CPCN for the greenfield 765kV lines to the existing 765kV system and the 345kV lines to the customer delivery point, and that it is a PJM supplemental project whose need was presented at the July 7, 2026 TEAC.
Note. Pending as of 2026-11-21: filed 2026-11-13, no final order.
County: “The Venator Substation Project will be constructed in Boyd County, Kentucky.” — Kentucky Power application, Case 2026-00324, p.20 (case 2026-00324).
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.