Turfway
In a case before the Kentucky Public Service Commission, “Turfway Reliability Project (two 138 kV lines, 1.24 and 1.34 miles)” (case 2025-00228). The station's utility: Duke Energy Ohio.
Described as new. The quoted wording calls this substation proposed or future. “the future Turfway Substation off Turfway Road in Florence, Kentucky” — Siting Board final order, Case 2025-00228, p.4 (case 2025-00228)
Also mentioned: “Duke Energy Ohio has identified the need for a new substation and electric transmission lines in the Florence area to help meet the region’s growing demand for electricity.” — Duke Energy Ohio application, Case 2025-00228, p.9 (case 2025-00228)
Note. The pleading says the Turfway Substation is located at 7650 Turfway Road, Florence, KY 41042, and that two lines on independent routes loop it in and out of Duke Energy Ohio's existing 138 kV circuit 23984. The county quote is printed for the two lines, which terminate at the substation.
Note. The Siting Board granted the construction certificate for the lines on 2026-01-14. The case does not give an in-service date or say who the end-use customers are.
Note. Turfway also appears in the PJM section of this tracker, from Duke Energy Ohio/Kentucky presentations to PJM (deok/turfway).
County: “The proposed Turfway nonregulated transmission lines are proposed to be constructed in Boone County, Kentucky to support the Turfway Substation.” — Duke Energy Ohio application pleading, Case 2025-00228, p.2 (case 2025-00228).
Generation interconnection requests filed in Boone, KY: PJM queue, 1 active of 7. Same county, not the same substation.
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.