Alcalde
In a case before the Kentucky Public Service Commission, “Cooper CCGT and Liberty RICE transmission needs (EKPC Cooper - Alcalde 161 kV double circuit)” (case 2025-00311). The station's utility: Kentucky Utilities.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “KU constructs a 345 kV bus at the Alcalde substation and installs a 2nd Alcalde 345/161 kV transformer” — East Kentucky Power Cooperative application, Case 2025-00311, p.40 (case 2025-00311)
Note. Printed in the transmission study attached to East Kentucky Power Cooperative's application (Case 2025-00311), in the table of projects needed for EKPC's Cooper CCGT and Liberty RICE generation with the Cooper - Alcalde 161 kV double circuit: a 345 kV bus and a second 345/161 kV transformer ($24.60 million) and an expanded 161 kV bus for the new circuits ($4.00 million). The order describes Alcalde as the existing LG&E/KU Alcalde 345-161kV Substation, so 345 kV is not a new voltage there; graded as a yard expansion.
Note. The work is LG&E/KU's; the Commission granted EKPC's CPCN for the line on 2026-03-09. The case does not give an in-service date for the Alcalde work.
County: “Kentucky Utilities Company’s (KU) (collectively, LG&E/KU) Alcalde Substation located in Pulaski County, Kentucky.” — Commission final order, Case 2025-00311, p.1 (case 2025-00311).
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.