Reed Farm (South Fork) substations

Named in 1 PJM planning document for 1 project, on October 6, 2026.

Existingdescribed as
DOMzone
230kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Do No Harm Analysis
DOM-2023-0002-DNH · s3722.3
Conceptual $20.0 M 12/31/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK → AZALEA LANE; BRAMBLETON; LOUDOUN; RACEFIELD; REED FARM SOUTH FORK SUBSTATIONS 2025-09-09 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 104
Do No Harm Analysis “install the remaining two (2) breakers and any associated substation equipment required to build out the six-breaker ring ultimate arrangement”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.