Olive substation interconnection queue
1 active project totalling 2.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
2.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-391 | Michiana Solar | 138 | 67 | Solar | Withdrawn |
| Z2-114 | Olive Solar Facility | 12.5 | 2.5 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.