Olive substation interconnection queue

1 active project totalling 2.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
2.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-391 Michiana Solar 138 67 Solar Withdrawn
Z2-114 Olive Solar Facility 12.5 2.5 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.