Scout Storage I
PJM queue ID AF2-060
Scout Storage I (AF2-060) is listed in the PJM interconnection queue as a 9 MW battery project in Accomack County, VA. The filing names Wattsville as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of April 1, 2026.
| Queue ID | AF2-060 |
|---|---|
| Project name | Scout Storage I |
| Status (as published) | Suspended |
| Substation | Wattsville |
| Point of interconnection | Wattsville 12 kV |
| County | Accomack |
| State | VA |
| Voltage | 12 kV |
| Capacity | 9 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-04-01 |
| Source dataset | serial |
Same substation and county
Wattsville substation: 3 requests in the PJM queue, 1 active totaling 9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-061 | Scout Energy Storage | 40 | Battery | Withdrawn |
| AE1-167 | Wattsville 12 kV | 6 | Solar | Withdrawn |
Accomack, VA: 47 requests in the PJM queue, 5 active totaling 420.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 9 |
| MW capacity | 9 |
| MFO | 9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.