Substation Scout

Scout Storage I

PJM queue ID AF2-060

Scout Storage I (AF2-060) is listed in the PJM interconnection queue as a 9 MW battery project in Accomack County, VA. The filing names Wattsville as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of April 1, 2026.

Queue IDAF2-060
Project nameScout Storage I
Status (as published)Suspended
SubstationWattsville
Point of interconnectionWattsville 12 kV
CountyAccomack
StateVA
Voltage12 kV
Capacity9 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-04-01
Source datasetserial

Same substation and county

Wattsville substation: 3 requests in the PJM queue, 1 active totaling 9 MW.

Queue IDProjectMWResourceStatus
AF2-061Scout Energy Storage40BatteryWithdrawn
AE1-167Wattsville 12 kV6SolarWithdrawn

Accomack, VA: 47 requests in the PJM queue, 5 active totaling 420.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9
MW capacity9
MFO9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.