Substation Scout

Vineland Unit #9

PJM queue ID S43

Vineland Unit #9 (S43) is listed in the PJM interconnection queue as a 17 MW project in Cumberland County, NJ. The filing names Vineland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 12, 2007.

Queue IDS43
Project nameVineland Unit #9
Status (as published)In Service
SubstationVineland
Point of interconnectionVineland
CountyCumberland
StateNJ
VoltageNot reported
Capacity17 MW
Resource (as published)Oil
Resource categoryOther (normalized for filtering)
Target commercial operation2007-11-12
Source datasetserial

Same substation and county

Vineland substation: 4 requests in the PJM queue, 2 active totaling 80 MW.

Queue IDProjectMWResourceStatus
S121Howard M. Down Power Plant Unit 1163GasIn Service
Y1-042Vineland 12kV1.3SolarWithdrawn
X3-018Vineland 12kV0SolarWithdrawn

Cumberland, NJ: 94 requests in the PJM queue, 15 active totaling 1,148.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy17
MW capacity17
MFO17

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner