Mole Creek substation interconnection queue
1 active project totaling 66 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Mole Creek as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Jun 2015 to Jan 2028 (3 filings). 1 active filing targets a date after November 27, 2026.
1active projects
66active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-315 | Mole Creek 345 kV | 345 | 90 | Wind | Withdrawn | Dec 2025 |
| AE1-113 | Panther Grove 2 | 345 | 66 | Wind | Under Construction | Jan 2028 |
| Y3-035 | Mole Creek 345kV | 345 | 12.7 | Wind | Withdrawn | Jun 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Woodford County, IL
- Powerton-Nevada: 4 active, 172.4 MW of 4 filed
- Powerton-Dresden: 1 active, 40 MW of 2 filed
- Minonk: none active of 3 filed
- Tazewell-Kendall: none active of 2 filed
Other PJM queue substations in Marshall County, IL
- Minonk: none active of 3 filed