Mole Creek substation interconnection queue
1 active project totalling 66 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
66active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-315 | Mole Creek 345 kV | 345 | 90 | Wind | Withdrawn |
| AE1-113 | Panther Grove 2 | 345 | 66 | Wind | Under Construction |
| Y3-035 | Mole Creek 345kV | 345 | 12.7 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.