Mole Creek substation interconnection queue

1 active project totalling 66 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
66active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI2-315 Mole Creek 345 kV 345 90 Wind Withdrawn
AE1-113 Panther Grove 2 345 66 Wind Under Construction
Y3-035 Mole Creek 345kV 345 12.7 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.