Minonk substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-379 Minonk 345 kV 345 137.2 Solar Withdrawn
AH1-361 Minonk 345 kV 345 50 Battery Withdrawn
Q85 Minonk 34.5kV 34.5 4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.