Substation Scout

Tasley 24.9 kV

PJM queue ID C01-2179

Tasley 24.9 kV (C01-2179) is listed in the PJM interconnection queue as a 9.4 MW battery project in Accomack County, VA. The filing names Tasley as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2026.

Queue IDC01-2179
Project nameTasley 24.9 kV
Status (as published)Active
SubstationTasley
Point of interconnectionTasley 24.9 kV
CountyAccomack
StateVA
Voltage24.9 kV
Capacity9.4 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2026-09-30
Source datasetcycle

Same substation and county

Tasley substation: 9 requests in the PJM queue, 2 active totaling 16.1 MW.

Queue IDProjectMWResourceStatus
T66Tasley6.7OtherIn Service
AH2-050Tasley 69kV20BatteryWithdrawn
AC1-009Tasley 69kV7.6SolarWithdrawn
AB2-033Tasley 69kV7.2SolarWithdrawn
AC1-052Tasley 69kV6.4SolarWithdrawn
AF1-243Tasley 25 kV5BatteryWithdrawn
V4-022Tasley Solar1.9SolarWithdrawn
AB2-030Tasley 25kV0BatteryWithdrawn

Accomack, VA: 47 requests in the PJM queue, 5 active totaling 420.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperScout Storage LLC
Transmission ownerODEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy9.42
MW capacity9.42
MFO9.42
Submitted date4/24/2026
Last updated6/17/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.