Isle of Wight, VA interconnection queue
11 active projects totalling 724.1 MW in the PJM queue, plus 14 with terminal status (shown greyed).
11active projects
724.1active MW
25total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-645 | Surry - Yadkin 500 kV | 500 | 450 | Hybrid | Withdrawn |
| C01-1372 | Septa 500 kV | 500 | 200 | Battery | Active |
| AC1-161 | Cavalier | 500 | 168.2 | Solar | In Service |
| AC2-141 | Sycamore Cross Solar | 500 | 168.2 | Solar | Engineering and Procurement |
| AG2-350 | Smithfield 230 kV | 230 | 100 | Battery | Withdrawn |
| AB2-042 | Smithfield-Surry 230kV | 230 | 89 | Solar | Withdrawn |
| AH1-216 | Smithfield-Surry 230 kV | 230 | 79.2 | Hybrid | Active |
| AD2-207 | Suffolk-Poe 115 kV | 115 | 60 | Solar | Withdrawn |
| AI2-078 | Myrtle-Windsor 115 kV | 115 | 52.7 | Solar | Withdrawn |
| AG2-137 | Surry-Chuckatuck 230 kV | 230 | 43.4 | Solar | Withdrawn |
| AG1-531 | Poolesville-Winchester 230 kV | 230 | 32.4 | Solar | Withdrawn |
| AC2-079 | Windsor PVI | 115 | 32.3 | Solar | Under Construction |
| AH1-279 | Poolesville - Winchester 230 kV | 230 | 30 | Solar | Withdrawn |
| AD2-085 | Knoxville Solar | 115 | 19.4 | Solar | Engineering and Procurement |
| AB2-149 | Myrtle-Windsor 115kV | 115 | 19 | Solar | Withdrawn |
| AE1-103 | Ho-Fel Solar | 115 | 16.8 | Solar | Suspended |
| AF2-301 | Poolesville-Winchester 230 kV | 230 | 15 | Solar | Withdrawn |
| AC2-161 | Solidago | 34.5 | 13.2 | Solar | Withdrawn |
| AE1-162 | Solidago Solar | 34.5 | 12 | Solar | In Service |
| AG1-081 | Poolesville 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AH1-185 | Benn's Church - Smithfield 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| C01-1008 | Benns Church 34.5 kV | 34.5 | 12 | Solar | Active |
| AE2-247 | Knoxville Solar | 115 | 8.4 | Solar | Engineering and Procurement |
| AF1-017 | Knoxville Solar | 115 | 7.6 | Solar | Engineering and Procurement |
| AC1-007 | Crittenden 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.