Myrtle-Windsor substation interconnection queue

2 active projects totaling 16 MW in the PJM queue, plus 2 with terminal status (shown grayed).

4 PJM queue filings name Myrtle-Windsor as the point of interconnection, all in Isle of Wight County, VA.

Target commercial operation dates as filed run from Oct 2017 to Dec 2027 (4 filings). 2 active filings target a date after November 27, 2026.

2active projects
16active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-078 Myrtle-Windsor 115 kV 115 52.7 Solar Withdrawn Dec 2025
AB2-149 Myrtle-Windsor 115kV 115 19 Solar Withdrawn Oct 2017
AE2-247 Knoxville Solar 115 8.4 Solar Engineering and Procurement Dec 2027
AF1-017 Knoxville Solar 115 7.6 Solar Engineering and Procurement Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Isle of Wight County, VA

All 25 PJM queue filings in Isle of Wight County, VA.