Myrtle-Windsor substation interconnection queue
2 active projects totalling 16 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
16active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-078 | Myrtle-Windsor 115 kV | 115 | 52.7 | Solar | Withdrawn |
| AB2-149 | Myrtle-Windsor 115kV | 115 | 19 | Solar | Withdrawn |
| AE2-247 | Knoxville Solar | 115 | 8.4 | Solar | Engineering and Procurement |
| AF1-017 | Knoxville Solar | 115 | 7.6 | Solar | Engineering and Procurement |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.