Substation Scout

Smithfield substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
12active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-350 Smithfield 230 kV 230 100 Battery Withdrawn
AC2-161 Solidago 34.5 13.2 Solar Withdrawn
AE1-162 Solidago Solar 34.5 12 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.