Poolesville-Winchester substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-531 Poolesville-Winchester 230 kV 230 32.4 Solar Withdrawn
AF2-301 Poolesville-Winchester 230 kV 230 15 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.