Ocean Bay substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
T122 Ocean Bay 138kV 138 120 Offshore Wind Withdrawn
AD2-212 Ocean Bay 128 kV 128 70 Offshore Wind Withdrawn
AG1-318 Ocean City-Battery Storage 12 0.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.