Kenney substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Kenney as the point of interconnection, all in Worcester County, MD.
Target commercial operation dates as filed run from Apr 2011 to Jun 2018 (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W2-099 | Kenney 69kV | 69 | 7.6 | Solar | Withdrawn | Jun 2012 |
| AA1-141 | Kenney 25kV | 25 | 5.7 | Solar | Withdrawn | Oct 2016 |
| AB2-177 | Kenney 25kV | 25 | 2.5 | Solar | Withdrawn | Jun 2018 |
| W1-131 | Kenney | n/r | 1.9 | Solar | Withdrawn | Apr 2011 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.