Kenney substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W2-099 Kenney 69kV 69 7.6 Solar Withdrawn
AA1-141 Kenney 25kV 25 5.7 Solar Withdrawn
AB2-177 Kenney 25kV 25 2.5 Solar Withdrawn
W1-131 Kenney n/r 1.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.