Worcester substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AA1-140 Worcester 25kV 25 7.6 Solar Withdrawn
W3-071 Worcester 25kV 25 4.8 Solar Withdrawn
AA1-094 Worcester 25kV 25 4 Solar Withdrawn
W3-160 Worcester Solar Facility 25 3.8 Solar Withdrawn
AC1-049 Worcester 25kV 25 1.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.