Mt. Olive substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC1-041 Mt. Olive 12kV 12 1.9 Solar Withdrawn
U3-003 Worcester County Renewable Energy 69 0 Gas Deactivated

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.