Palmer Springs 115 kV
PJM queue ID C01-1988
Palmer Springs 115 kV (C01-1988) is listed in the PJM interconnection queue as a 140 MW battery project in Mecklenburg County, VA. The filing names Palmer Springs as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1988 |
|---|---|
| Project name | Palmer Springs 115 kV |
| Status (as published) | Active |
| Substation | Palmer Springs |
| Point of interconnection | Palmer Springs 115 kV |
| County | Mecklenburg |
| State | VA |
| Voltage | 115 kV |
| Capacity | 140 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Palmer Springs substation: 9 requests in the PJM queue, 2 active totaling 240 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2006 | Palmer Springs 115 kV | 100 | Battery | Active |
| AG2-641 | Palmer Springs 115 kV | 48 | Solar | Withdrawn |
| AG1-440 | Palmer Springs 115 kV | 45 | Solar | Withdrawn |
| AG1-441 | Palmer Springs 115 kV | 45 | Solar | Withdrawn |
| AJ1-003 | Palmer Springs 115 kV | 40 | Battery | Withdrawn |
| AG2-642 | Palmer Springs 115 kV | 32 | Battery | Withdrawn |
| AG1-445 | Palmer Springs 115 kV | 26 | Battery | Withdrawn |
| AG1-446 | Palmer Springs 115 kV | 26 | Battery | Withdrawn |
Mecklenburg, VA: 61 requests in the PJM queue, 14 active totaling 990.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Oriden LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 140.0 |
| MFO | 200.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.