Jakes Hollow Solar

PJM queue ID AF1-153

Jakes Hollow Solar (AF1-153) is listed in the PJM interconnection queue as a 12 MW solar project in Elk County, PA. The filing names Motion-Ridgeway as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 29, 2027.

Queue IDAF1-153
Project nameJakes Hollow Solar
Status (as published)Suspended
SubstationMotion-Ridgeway
Point of interconnectionMotion-Ridgeway 46 kV
CountyElk
StatePA
Voltage46 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-29
Source datasetserial

Same substation and county

Motion-Ridgeway substation: 2 requests in the PJM queue, 1 active totaling 12 MW.

Queue IDProjectMWResourceStatus
AG1-385Motion-Ridgeway 46 kV15.4SolarWithdrawn

Elk, PA: 14 requests in the PJM queue, 2 active totaling 93 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.