Jakes Hollow Solar
PJM queue ID AF1-153
Jakes Hollow Solar (AF1-153) is listed in the PJM interconnection queue as a 12 MW solar project in Elk County, PA. The filing names Motion-Ridgeway as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 29, 2027.
| Queue ID | AF1-153 |
|---|---|
| Project name | Jakes Hollow Solar |
| Status (as published) | Suspended |
| Substation | Motion-Ridgeway |
| Point of interconnection | Motion-Ridgeway 46 kV |
| County | Elk |
| State | PA |
| Voltage | 46 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-29 |
| Source dataset | serial |
Same substation and county
Motion-Ridgeway substation: 2 requests in the PJM queue, 1 active totaling 12 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-385 | Motion-Ridgeway 46 kV | 15.4 | Solar | Withdrawn |
Elk, PA: 14 requests in the PJM queue, 2 active totaling 93 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 12 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.