Goochland, VA interconnection queue
2 active projects totalling 24 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
24active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U3-016 | Midlothian 230kV | 230 | 550 | Gas | Withdrawn |
| AH1-737 | Not reported | n/r | 200 | Battery | Withdrawn |
| AH1-347 | North Pole 492 34.5 kV | 34.5 | 15 | Solar | Withdrawn |
| AH1-170 | Horsepen Creek Solar I | 115 | 12 | Solar | Active |
| AH1-171 | Columbia DP 115kV | 115 | 12 | Solar | Withdrawn |
| C01-2128 | Columbia DP 115 kV | 115 | 12 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.