Midlothian 34.5 kV
PJM queue ID AH1-071
Midlothian 34.5 kV (AH1-071) is listed in the PJM interconnection queue as a 12 MW solar project in Powhatan County, VA. The filing names Midlothian as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 28, 2026.
| Queue ID | AH1-071 |
|---|---|
| Project name | Midlothian 34.5 kV |
| Status (as published) | Active |
| Substation | Midlothian |
| Point of interconnection | Midlothian 34.5 kV |
| County | Powhatan |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-03-28 |
| Source dataset | cycle |
Same substation and county
Midlothian substation: 5 requests in the PJM queue, 4 active totaling 282 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-088 | Midlothian 230 kV | 150 | Battery | Active |
| C01-1292 | Midlothian 230 kV | 100 | Battery | Active |
| AF2-085 | Dry Bridge Energy Center | 20 | Battery | In Service |
| U3-016 | Midlothian 230kV | 550 | Gas | Withdrawn |
Powhatan, VA: 9 requests in the PJM queue, 5 active totaling 105 MW.
A substation with the same name is named in PJM transmission planning materials: Midlothian (DOM, 10 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 20.0 |
| MW capacity | 12.0 |
| MFO | 20.0 |
| Submitted date | 7/29/2021 |
| Last updated | 8/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.