Columbia DP substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Columbia DP as the point of interconnection, all in Goochland County, VA.
Target commercial operation dates as filed run from Dec 2024 to Dec 2027 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-170 | Horsepen Creek Solar I | 115 | 12 | Solar | Withdrawn | Dec 2027 |
| AH1-171 | Columbia DP 115kV | 115 | 12 | Solar | Withdrawn | Dec 2024 |
| C01-2128 | Columbia DP 115 kV | 115 | 12 | Solar | Active | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-170 | Terminal status | 12 | Active → Withdrawn |
Other PJM queue substations in Goochland County, VA
- Midlothian: 4 active, 282 MW of 5 filed