Columbia DP substation interconnection queue

2 active projects totalling 24 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
24active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-170 Horsepen Creek Solar I 115 12 Solar Active
AH1-171 Columbia DP 115kV 115 12 Solar Withdrawn
C01-2128 Columbia DP 115 kV 115 12 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.