Substation Scout

Powhatan, VA interconnection queue

5 active projects totalling 105 MW in the PJM queue, plus 4 with terminal status (shown greyed).

5active projects
105active MW
9total filed
Queue IDProjectkVMWResourceStatus
AC2-165 Cartersville Solar 230 57 Solar Under Construction
AB2-026 Powhatan 34.5kV 34.5 13.8 Solar In Service
AE1-075 Powhatan Solar I, LLC 34.5 12 Solar In Service
AH1-071 Midlothian 34.5 kV 34.5 12 Solar Active
AF2-144 Scott 1 BESS 34.5 10.2 Hybrid In Service
AF2-244 Powhatan 34.5 kV 34.5 9.4 Solar Withdrawn
AH1-349 Powhatan 406 34.5 kV 34.5 9 Solar Withdrawn
AI2-274 Powhatan 34.5 kV 34.5 6.8 Hybrid Withdrawn
AH1-184 Powhatan - Powhatan DP 24.94 kV 24.9 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.