Substation Scout

Powhatan substation interconnection queue

3 active projects totalling 36 MW in the PJM queue, plus 2 with terminal status (shown greyed).

3active projects
36active MW
5total filed
Queue IDProjectkVMWResourceStatus
AB2-026 Powhatan 34.5kV 34.5 13.8 Solar In Service
AE1-075 Powhatan Solar I, LLC 34.5 12 Solar In Service
AF2-144 Scott 1 BESS 34.5 10.2 Hybrid In Service
AF2-244 Powhatan 34.5 kV 34.5 9.4 Solar Withdrawn
AI2-274 Powhatan 34.5 kV 34.5 6.8 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.