Fairlawn substation interconnection queue
1 active project totalling 20 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
20active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C09 | Fairlawn 26.4kV | 26.4 | 37 | Gas | Withdrawn |
| R66 | Marcal Paper | 138 | 20 | Gas | In Service |
| W1-038 | Fairlawn 138kV | 138 | 10 | Gas | Withdrawn |
| X2-011 | Elmwood | 138 | 6 | Gas | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.