Substation Scout

Bergen, NJ interconnection queue

17 active projects totalling 1,244.5 MW in the PJM queue, plus 22 with terminal status (shown greyed).

17active projects
1,244.5active MW
39total filed
Queue IDProjectkVMWResourceStatus
U2-100 Bergen 230kV 230 800 Not reported Withdrawn
A49 West Hempfield 230kV 230 750 Gas Withdrawn
Q75 Bergen 230kV 230 685 Not reported Withdrawn
AA1-039 Bergen 230kV 230 660 Not reported Withdrawn
A05 Bergen n/r 500 Gas In Service
O66 Hudson Transmission Project 230 320 Not reported In Service
C01-1270 Bergen 138 kV 138 175 Battery Active
AH1-703 Bergen 230kV 230 51.3 Gas Active
AB2-092 Bergen Generating Station 138 51.1 Gas Partially in Service - Under Construction
G10 Bergen #2 n/r 50 Gas In Service
Y3-107 Bergen 230kV 230 45 Gas In Service
C09 Fairlawn 26.4kV 26.4 37 Gas Withdrawn
AH2-194 Bergen 138kV 138 20 Gas Withdrawn
R66 Marcal Paper 138 20 Gas In Service
V4-019 Bergen Generating Station 230 10 Gas In Service
W1-038 Fairlawn 138kV 138 10 Gas Withdrawn
Y3-052 Bergen n/r 10 Gas In Service
AE1-126 Kingsland 26 kV 26 8.3 Solar Withdrawn
T98 South Mahwah 69kV 69 6 Gas Withdrawn
X2-011 Elmwood 138 6 Gas Deactivated
Y3-045 Bergen Genertating Station n/r 5 Gas In Service
G25 Baler LF 26.4 3.8 Gas In Service
G24 BCUA LF 26.4 1.9 Gas In Service
AG1-200 Kingsland 13 kV 13 1.7 Solar Withdrawn
AF1-168 Kingsland 26.4 kV I 26.4 1.7 Solar Withdrawn
AF1-169 Kingsland 26.4 kV II 26.4 1.7 Solar Withdrawn
H27 BCUA LF 26.4 1 Gas In Service
X2-003 East Rutherford 13kV 13 0.8 Solar Withdrawn
AE2-164 Saddle Brook 13.2 kV 13.2 0.6 Solar Withdrawn
W3-004 Ridgefield 13kV 13 0.5 Solar Withdrawn
X1-072 Hackensack Solar Farm n/r 0.4 Solar In Service
AB1-093 Oakland n/r 0 Gas Withdrawn
AD1-003 North Bergen II 480V n/r 0 Gas Withdrawn
AD1-004 Paramus 480V n/r 0 Gas Withdrawn
AD1-007 Bergenfield 480V n/r 0 Gas Withdrawn
AD1-054 Bergen 13kV 13 0 Solar In Service
AE2-100 Carlstadt 13.2 kV 13.2 0 Solar Withdrawn
AG1-055 Bergen 230 kV 230 0 Not reported Withdrawn
V1-034 Hudson Transmission Project 230 0 Not reported In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.