Substation Scout

Louisa 230 kV

PJM queue ID C01-1410

Louisa 230 kV (C01-1410) is listed in the PJM interconnection queue as a 200 MW battery project in Louisa County, VA. The filing names Louisa as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2031.

Queue IDC01-1410
Project nameLouisa 230 kV
Status (as published)Active
SubstationLouisa
Point of interconnectionLouisa 230 kV
CountyLouisa
StateVA
Voltage230 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-10-31
Source datasetcycle

Same substation and county

Louisa substation: 5 requests in the PJM queue, 2 active totaling 203 MW.

Queue IDProjectMWResourceStatus
U4-009Louisa Gas Turbines Units 1 through 53GasIn Service
C01-1293Louisa 230 kV200BatteryWithdrawn
AA2-158Louisa 34.5kV14SolarWithdrawn
AH1-229Louisa 230kV6GasWithdrawn

Louisa, VA: 36 requests in the PJM queue, 11 active totaling 1,746.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEDP Renewables North America LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity200.0
MFO200.0
Submitted date4/27/2026
Last updated7/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.