St. Benedict-Patton substation interconnection queue
2 active projects totaling 5.4 MW in the PJM queue.
2 PJM queue filings name St. Benedict-Patton as the point of interconnection, all in Cambria County, PA.
Target commercial operation dates as filed run from Jun 2013 to Dec 2015 (2 filings).
2active projects
5.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| V3-030 | Patton Wind Farm | 46 | 4 | Wind | In Service | Jun 2013 |
| Z2-014 | Patton Wind Farm | n/r | 1.4 | Wind | In Service | Dec 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cambria County, PA
- Hunterstown-Conemaugh: 2 active, 1,100 MW of 4 filed
- Cambria Slope: 1 active, 200 MW of 6 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Bear Rock-Johnstown: 2 active, 90 MW of 2 filed
- Johnstown-Altoona: 2 active, 26 MW of 3 filed
- Glory: 1 active, 6 MW of 2 filed
- Krayn: none active of 3 filed
- Revloc: none active of 2 filed