Cambria Slope substation interconnection queue

1 active project totaling 200 MW in the PJM queue, plus 5 with terminal status (shown grayed).

6 PJM queue filings name Cambria Slope as the point of interconnection, all in Cambria County, PA.

Target commercial operation dates as filed run from Feb 2007 to Dec 2030 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PENELEC (1 filing).

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-127 Cambria Slope 115 kV 115 235 Gas Withdrawn Sep 2020
C01-1175 Cambria Slope 115 kV 115 200 Battery Active Dec 2030
M22 Cambria Slope 115kV 115 125 Coal Withdrawn Feb 2008
AJ1-016 Cambria Slope 115 kV 115 100 Battery Withdrawn Nov 2028
N28 Cambria Slope 115kV 115 40 Coal Withdrawn Feb 2007
AE1-165 Cambria Slope 115kV 115 12 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Cambria County, PA

All 46 PJM queue filings in Cambria County, PA.