Bear Rock-Johnstown substation interconnection queue

2 active projects totaling 90 MW in the PJM queue.

2 PJM queue filings name Bear Rock-Johnstown as the point of interconnection, all in Cambria County, PA.

Target commercial operation dates as filed run from Nov 2023 to Jan 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: PENELEC (1 filing).

2active projects
90active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-224 CPV Maple Hill Solar 230 60 Solar In Service Nov 2023
AF2-050 Maple Hill-Fiddlers 1 SP (Bear Rock) 230 30 Solar EP Jan 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Cambria County, PA

All 46 PJM queue filings in Cambria County, PA.