Bear Rock-Johnstown substation interconnection queue
2 active projects totaling 90 MW in the PJM queue.
2 PJM queue filings name Bear Rock-Johnstown as the point of interconnection, all in Cambria County, PA.
Target commercial operation dates as filed run from Nov 2023 to Jan 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PENELEC (1 filing).
2active projects
90active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-224 | CPV Maple Hill Solar | 230 | 60 | Solar | In Service | Nov 2023 |
| AF2-050 | Maple Hill-Fiddlers 1 SP (Bear Rock) | 230 | 30 | Solar | EP | Jan 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cambria County, PA
- Hunterstown-Conemaugh: 2 active, 1,100 MW of 4 filed
- Cambria Slope: 1 active, 200 MW of 6 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Johnstown-Altoona: 2 active, 26 MW of 3 filed
- Glory: 1 active, 6 MW of 2 filed
- St. Benedict-Patton: 2 active, 5.4 MW of 2 filed
- Krayn: none active of 3 filed
- Revloc: none active of 2 filed
Site Scanner