Substation Scout

Revloc substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI1-114 Revloc 46 kV 46 9.9 Hybrid Withdrawn
AH2-320 Revloc 34.5 kV 34.5 6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.