Krayn substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Krayn as the point of interconnection, all in Cambria County, PA.

Target commercial operation dates as filed run from Dec 2015 to Dec 2028 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-247 Krayn 115 kV 115 14.7 Wind Withdrawn Dec 2028
AH2-403 Krayn 115 kV 115 14.7 Wind Withdrawn Dec 2028
X2-031 Highland III Wind Farm 115 6.5 Wind Withdrawn Dec 2015

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Cambria County, PA

All 46 PJM queue filings in Cambria County, PA.