Krayn substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Krayn as the point of interconnection, all in Cambria County, PA.
Target commercial operation dates as filed run from Dec 2015 to Dec 2028 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-247 | Krayn 115 kV | 115 | 14.7 | Wind | Withdrawn | Dec 2028 |
| AH2-403 | Krayn 115 kV | 115 | 14.7 | Wind | Withdrawn | Dec 2028 |
| X2-031 | Highland III Wind Farm | 115 | 6.5 | Wind | Withdrawn | Dec 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cambria County, PA
- Hunterstown-Conemaugh: 2 active, 1,100 MW of 4 filed
- Cambria Slope: 1 active, 200 MW of 6 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Bear Rock-Johnstown: 2 active, 90 MW of 2 filed
- Johnstown-Altoona: 2 active, 26 MW of 3 filed
- Glory: 1 active, 6 MW of 2 filed
- St. Benedict-Patton: 2 active, 5.4 MW of 2 filed
- Revloc: none active of 2 filed