Krayn substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH2-247 Krayn 115 kV 115 14.7 Wind Withdrawn
AH2-403 Krayn 115 kV 115 14.7 Wind Withdrawn
X2-031 Highland III Wind Farm 115 6.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.