Cambria, PA interconnection queue
13 active projects totalling 1,643.7 MW in the PJM queue, plus 33 with terminal status (shown greyed).
13active projects
1,643.7active MW
46total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-076 | CPV Fairview Energy Center | 500 | 1,000 | Gas | In Service |
| V3-046 | Conemaugh-Juniata 500kV | 500 | 741 | Not reported | Withdrawn |
| D21 | Hunterstown-Conemaugh 500kV | 500 | 550 | Gas | Withdrawn |
| D22 | Hunterstown-Conemaugh 500kV | 500 | 550 | Gas | Withdrawn |
| AD1-127 | Cambria Slope 115 kV | 115 | 235 | Gas | Withdrawn |
| C01-1175 | Cambria Slope 115 kV | 115 | 200 | Battery | Active |
| C01-2043 | Johnstown 230 kV | 230 | 200 | Battery | Active |
| AI2-446 | Medera - Westover South 115 kV | 115 | 150 | Hybrid | Withdrawn |
| M22 | Cambria Slope 115kV | 115 | 125 | Coal | Withdrawn |
| AC1-108 | CPV Fairview Energy Center | 500 | 100 | Gas | In Service |
| AI1-179 | Colver Power Project 115 kV | 115 | 100 | Hybrid | Withdrawn |
| AJ1-016 | Cambria Slope 115 kV | 115 | 100 | Battery | Withdrawn |
| N49 | Salix-Claysburg 115kV | 115 | 90 | Wind | Withdrawn |
| AE2-224 | CPV Maple Hill Solar | 230 | 60 | Solar | In Service |
| AH1-462 | Black Tulip Storage | 115 | 60 | Battery | Withdrawn |
| AH2-116 | Garman - Westover South 115 kV | 115 | 50 | Solar | Withdrawn |
| AF2-330 | Claysburg-Summit 115 kV | 115 | 48.7 | Solar | Withdrawn |
| N28 | Cambria Slope 115kV | 115 | 40 | Coal | Withdrawn |
| AF2-050 | Maple Hill-Fiddlers 1 SP (Bear Rock) | 230 | 30 | Solar | EP |
| S65 | Cambria | n/r | 17 | Wind | Withdrawn |
| N39 | Allegheny Ridge WF1 | 230 | 16 | Wind | In Service |
| AH2-247 | Krayn 115 kV | 115 | 14.7 | Wind | Withdrawn |
| AH2-403 | Krayn 115 kV | 115 | 14.7 | Wind | Withdrawn |
| AH2-248 | Carrolltown 46 kV | 46 | 14.7 | Wind | Withdrawn |
| S11 | Seward-Tower 51 115kV | 115 | 14 | Wind | Withdrawn |
| AH2-292 | Bear Rock 230 kV | 230 | 13.6 | Wind | Withdrawn |
| P01 | Rock Run Wind Park | 115 | 13 | Wind | Withdrawn |
| R32 | Highland North | 115 | 12.3 | Wind | In Service |
| AE1-165 | Cambria Slope 115kV | 115 | 12 | Solar | Withdrawn |
| AG1-382 | SGC Tap-Reese REC 46 kV | 46 | 12 | Solar | Withdrawn |
| AG1-387 | Beth 33-Lilly 46 kV | 46 | 12 | Solar | Withdrawn |
| AH1-212 | Noels Creek Solar | 46 | 12 | Solar | Withdrawn |
| AF2-312 | Carrolltown-Patton 46 kV | 46 | 10.8 | Solar | Withdrawn |
| O38 | North Alleghney WF | 230 | 10 | Wind | In Service |
| AI1-114 | Revloc 46 kV | 46 | 9.9 | Hybrid | Withdrawn |
| R09 | Johnstown-Altoona 230 kV | 230 | 9.6 | Wind | Withdrawn |
| AG2-425 | Jackson Road - Nanty Glo 46 kV | 46 | 9 | Solar | Withdrawn |
| X2-031 | Highland III Wind Farm | 115 | 6.5 | Wind | Withdrawn |
| A10 | Colver Power | 115 | 6 | Coal | In Service |
| AH2-320 | Revloc 34.5 kV | 34.5 | 6 | Solar | Withdrawn |
| P22 | North Allegheny WF | 230 | 4 | Wind | In Service |
| V3-030 | Patton Wind Farm | 46 | 4 | Wind | In Service |
| AF2-045 | Cambria Energy | 115 | 2 | Battery | Withdrawn |
| Z2-014 | Patton Wind Farm | n/r | 1.4 | Wind | In Service |
| Q21 | Lewistown-Juniata 230kV | 230 | 0 | Not reported | Withdrawn |
| Q38 | C2 Tap - Mt. Union 46kV | 46 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.