Substation Scout

Johnstown-Altoona substation interconnection queue

2 active projects totalling 26 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
26active MW
3total filed
Queue IDProjectkVMWResourceStatus
N39 Allegheny Ridge WF1 230 16 Wind In Service
O38 North Alleghney WF 230 10 Wind In Service
R09 Johnstown-Altoona 230 kV 230 9.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.