Johnstown-Altoona substation interconnection queue
2 active projects totalling 26 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
26active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| N39 | Allegheny Ridge WF1 | 230 | 16 | Wind | In Service |
| O38 | North Alleghney WF | 230 | 10 | Wind | In Service |
| R09 | Johnstown-Altoona 230 kV | 230 | 9.6 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.