Windsor PVI

PJM queue ID AC2-079

Windsor PVI (AC2-079) is listed in the PJM interconnection queue as a 32.3 MW solar project in Isle of Wight County, VA. The filing names Ivor-Oak Ridge as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of September 4, 2027.

Queue IDAC2-079
Project nameWindsor PVI
Status (as published)Under Construction
SubstationIvor-Oak Ridge
Point of interconnectionIvor-Oak Ridge 115kV
CountyIsle of Wight
StateVA
Voltage115 kV
Capacity32.3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-04
Source datasetserial

Same substation and county

Ivor-Oak Ridge substation: 2 requests in the PJM queue, 1 active totaling 32.3 MW.

Queue IDProjectMWResourceStatus
AF2-402Ivor-Oak Ridge 115 kV6.3SolarWithdrawn

Isle of Wight, VA: 25 requests in the PJM queue, 9 active totaling 444.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy85
MW capacity32.3
MFO85

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.