Windsor PVI
PJM queue ID AC2-079
Windsor PVI (AC2-079) is listed in the PJM interconnection queue as a 32.3 MW solar project in Isle of Wight County, VA. The filing names Ivor-Oak Ridge as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of September 4, 2027.
| Queue ID | AC2-079 |
|---|---|
| Project name | Windsor PVI |
| Status (as published) | Under Construction |
| Substation | Ivor-Oak Ridge |
| Point of interconnection | Ivor-Oak Ridge 115kV |
| County | Isle of Wight |
| State | VA |
| Voltage | 115 kV |
| Capacity | 32.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-09-04 |
| Source dataset | serial |
Same substation and county
Ivor-Oak Ridge substation: 2 requests in the PJM queue, 1 active totaling 32.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-402 | Ivor-Oak Ridge 115 kV | 6.3 | Solar | Withdrawn |
Isle of Wight, VA: 25 requests in the PJM queue, 9 active totaling 444.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 85 |
| MW capacity | 32.3 |
| MFO | 85 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.