Hughesville 69 kV
PJM queue ID C01-1560
Hughesville 69 kV (C01-1560) is listed in the PJM interconnection queue as a 100 MW battery project in Charles County, MD. The filing names Hughesville as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.
| Queue ID | C01-1560 |
|---|---|
| Project name | Hughesville 69 kV |
| Status (as published) | Active |
| Substation | Hughesville |
| Point of interconnection | Hughesville 69 kV |
| County | Charles |
| State | MD |
| Voltage | 69 kV |
| Capacity | 100 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | cycle |
Same substation and county
Hughesville substation: 6 requests in the PJM queue, 3 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1561 | Hughesville 69 kV | 50 | Battery | Active |
| C01-1562 | Hughesville 69 kV | 50 | Battery | Active |
| AE1-231 | Hughesville 69 kV | 9.4 | Hybrid | Withdrawn |
| AH1-154B | Hughesville 12 kV | 3 | Solar | Withdrawn |
| AH2-176 | Hughesville 12 kV | 0 | Hybrid | Withdrawn |
Charles, MD: 50 requests in the PJM queue, 12 active totaling 1,900.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | MDHF BATTERY STORAGE, LLC |
|---|---|
| Transmission owner | SMECO |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 100.0 |
| MW capacity | 100.0 |
| MFO | 100.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.