Stonegate Renewable Energy

PJM queue ID Y3-034

Stonegate Renewable Energy (Y3-034) is listed in the PJM interconnection queue as a 1.8 MW gas project in Schuylkill County, PA. The filing names Eldred-Pine Grove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2013.

Queue IDY3-034
Project nameStonegate Renewable Energy
Status (as published)In Service
SubstationEldred-Pine Grove
Point of interconnectionEldred-Pine Grove 690kV
CountySchuylkill
StatePA
Voltage690 kV
Capacity1.8 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2013-12-31
Source datasetserial

Same substation and county

Eldred-Pine Grove substation: 2 requests in the PJM queue, 2 active totaling 4.3 MW.

Queue IDProjectMWResourceStatus
U2-067Westwood Generation2.5CoalIn Service

Schuylkill, PA: 46 requests in the PJM queue, 7 active totaling 47.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity1.8
MFO10.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.