Stonegate Renewable Energy
PJM queue ID Y3-034
Stonegate Renewable Energy (Y3-034) is listed in the PJM interconnection queue as a 1.8 MW gas project in Schuylkill County, PA. The filing names Eldred-Pine Grove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2013.
| Queue ID | Y3-034 |
|---|---|
| Project name | Stonegate Renewable Energy |
| Status (as published) | In Service |
| Substation | Eldred-Pine Grove |
| Point of interconnection | Eldred-Pine Grove 690kV |
| County | Schuylkill |
| State | PA |
| Voltage | 690 kV |
| Capacity | 1.8 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2013-12-31 |
| Source dataset | serial |
Same substation and county
Eldred-Pine Grove substation: 2 requests in the PJM queue, 2 active totaling 4.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| U2-067 | Westwood Generation | 2.5 | Coal | In Service |
Schuylkill, PA: 46 requests in the PJM queue, 7 active totaling 47.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0 |
| MW capacity | 1.8 |
| MFO | 10.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.