Dauphin-Pine Grove substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Dauphin-Pine Grove as the point of interconnection, all in Dauphin County, PA.

Target commercial operation dates as filed run from Mar 2020 to Mar 2022 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-293 Dauphin-Pine Grove 69kV 69 20 Solar Withdrawn Jun 2020
AE2-294 Dauphin-Pine Grove 69 kV 69 20 Battery Withdrawn Mar 2020
AG1-396 Dauphin-Pine Grove 69 kV 69 4 Solar Withdrawn Mar 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Dauphin County, PA

All 34 PJM queue filings in Dauphin County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first