Dauphin-Pine Grove substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-293 | Dauphin-Pine Grove 69kV | 69 | 20 | Solar | Withdrawn |
| AE2-294 | Dauphin-Pine Grove 69 kV | 69 | 20 | Battery | Withdrawn |
| AG1-396 | Dauphin-Pine Grove 69 kV | 69 | 4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.