Dauphin-Pine Grove substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-293 Dauphin-Pine Grove 69kV 69 20 Solar Withdrawn
AE2-294 Dauphin-Pine Grove 69 kV 69 20 Battery Withdrawn
AG1-396 Dauphin-Pine Grove 69 kV 69 4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.