Red Maple Solar
PJM queue ID AG1-127
Red Maple Solar (AG1-127) is listed in the PJM interconnection queue as a 57.1 MW solar project in DeKalb County, IL. The filing names Crego Rd as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of May 31, 2028.
| Queue ID | AG1-127 |
|---|---|
| Project name | Red Maple Solar |
| Status (as published) | EP |
| Substation | Crego Rd |
| Point of interconnection | Crego Rd 138 kV |
| County | DeKalb |
| State | IL |
| Voltage | 138 kV |
| Capacity | 57.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-05-31 |
| Source dataset | cycle |
Same substation and county
Crego Rd substation: 2 requests in the PJM queue, 2 active totaling 114 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-366 | Red Maple Solar | 56.9 | Solar | Engineering and Procurement |
DeKalb, IL: 40 requests in the PJM queue, 3 active totaling 435.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Red Maple Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 95.1 |
| MW capacity | 57.1 |
| MFO | 190.0 |
| Submitted date | 8/31/2020 |
| Last updated | 9/14/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.