Substation Scout

Red Maple Solar

PJM queue ID AF2-366

Red Maple Solar (AF2-366) is listed in the PJM interconnection queue as a 56.9 MW solar project in Adams County, IL. The filing names Crego Rd as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 7, 2028.

Queue IDAF2-366
Project nameRed Maple Solar
Status (as published)Engineering and Procurement
SubstationCrego Rd
Point of interconnectionCrego Rd 138 kV
CountyAdams
StateIL
Voltage138 kV
Capacity56.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-02-07
Source datasetserial

Same substation and county

Crego Rd substation: 2 requests in the PJM queue, 2 active totaling 114 MW.

Queue IDProjectMWResourceStatus
AG1-127Red Maple Solar57.1SolarEP

Adams, IL: 8 requests in the PJM queue, 1 active totaling 56.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy94.9
MW capacity56.94
MFO94.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first