Thelma substation interconnection queue
2 active projects totaling 207.7 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Thelma as the point of interconnection, all in Northhampton County, NC.
Target commercial operation dates as filed run from Dec 2023 to Dec 2027 (4 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-086 | Cherry Solar | 230 | 123.7 | Solar | Partially in Service - Under Construction | Mar 2027 |
| AB1-132 | Oak Solar | 230 | 84 | Solar | In Service | Dec 2023 |
| AG1-106 | Oak Solar | 230 | 16 | Solar | Withdrawn | Jun 2024 |
| AG2-237 | Thelma 230kV | 230 | 0 | Battery | Withdrawn | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Thelma” in NC. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Thelma: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Northhampton County, NC
- Carson-Wake: 1 active, 1,376 MW of 3 filed
- Clubhouse-Lakeview: 1 active, 67 MW of 3 filed
- Carolina-Jackson: 2 active, 54.8 MW of 2 filed
- Carolina- Earleys: none active of 2 filed
- Earleys-Northampton: none active of 2 filed