Thelma substation interconnection queue
2 active projects totalling 207.7 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
207.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC1-086 | Cherry Solar | 230 | 123.7 | Solar | Partially in Service - Under Construction |
| AB1-132 | Oak Solar | 230 | 84 | Solar | In Service |
| AG1-106 | Oak Solar | 230 | 16 | Solar | Withdrawn |
| AG2-237 | Thelma 230kV | 230 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.