Substation Scout

Thelma substation interconnection queue

2 active projects totalling 207.7 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
207.7active MW
4total filed
Queue IDProjectkVMWResourceStatus
AC1-086 Cherry Solar 230 123.7 Solar Partially in Service - Under Construction
AB1-132 Oak Solar 230 84 Solar In Service
AG1-106 Oak Solar 230 16 Solar Withdrawn
AG2-237 Thelma 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.