Substation Scout

Northhampton, NC interconnection queue

5 active projects totalling 313.4 MW in the PJM queue, plus 13 with terminal status (shown greyed).

5active projects
313.4active MW
18total filed
Queue IDProjectkVMWResourceStatus
AC2-093 Brunswick-Wake 500 kV 500 429.4 Solar Withdrawn
AC1-086 Cherry Solar 230 123.7 Solar Partially in Service - Under Construction
AB1-132 Oak Solar 230 84 Solar In Service
AB2-128 Clubhouse-Lakeview 230kV 230 57.4 Solar Withdrawn
AA1-064 Carson-Wake 500kV 500 56 Solar Withdrawn
AA1-137 Earleys-Northampton 230kV 230 56 Solar Withdrawn
AA2-181 Earleys-Northampton 230kV 230 56 Solar Withdrawn
AA2-053 Gutenberg Solar 115 52.4 Solar In Service
AA1-063A Spuds Lane Solar Park 115 50.9 Solar In Service
AH1-434 ACE Development Company, LLC 115 45 Solar Withdrawn
AC2-159 Jackson-Woodland 115kV 115 40 Solar Withdrawn
AH1-435 Carolina- Earleys 115kV 115 30 Battery Withdrawn
AG1-313 Jackson DP-Occoneechee 115 kV 115 27.6 Solar Withdrawn
AG1-106 Oak Solar 230 16 Solar Withdrawn
AG1-552 Ray Solar 34.5 12.2 Solar Withdrawn
AA2-149 Carolina-Seaboard 115kV 115 7.6 Solar Withdrawn
AA2-174 Gutenberg Solar 115 2.4 Solar In Service
AG2-237 Thelma 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.