Lexington Park substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-017 Whitetail VI 69 10.3 Solar Withdrawn
AF2-181 Lexington Park 69 kV 69 3.1 Solar Withdrawn
AG1-361 Lexington Park 69 kV 69 2.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.