Lexington Park substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-017 | Whitetail VI | 69 | 10.3 | Solar | Withdrawn |
| AF2-181 | Lexington Park 69 kV | 69 | 3.1 | Solar | Withdrawn |
| AG1-361 | Lexington Park 69 kV | 69 | 2.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.