Chalk Point 230 kV
PJM queue ID AH1-552
Chalk Point 230 kV (AH1-552) is listed in the PJM interconnection queue as a 670.2 MW hybrid project in Prince George's County, MD. The filing names Chalk Point as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2027.
| Queue ID | AH1-552 |
|---|---|
| Project name | Chalk Point 230 kV |
| Status (as published) | Active |
| Substation | Chalk Point |
| Point of interconnection | Chalk Point 230 kV |
| County | Prince George's |
| State | MD |
| Voltage | 230 kV |
| Capacity | 670.2 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2027-06-01 |
| Source dataset | cycle |
Same substation and county
Chalk Point substation: 5 requests in the PJM queue, 2 active totaling 676.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| F08 | Chalk Point | 6 | Gas | In Service |
| U2-081 | Chalk Point 230kV | 600 | Gas | Withdrawn |
| U2-083 | Chalk Point 230kV | 400 | Gas | Withdrawn |
| G35 | Chalk Point | 340 | Gas | Withdrawn |
Prince George's, MD: 57 requests in the PJM queue, 14 active totaling 3,551.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Chalk Point Reliability Storage LLC |
|---|---|
| Transmission owner | PEPCO |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 670.2 |
| MW capacity | 670.2 |
| MFO | 670.2 |
| Submitted date | 9/10/2021 |
| Last updated | 9/1/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.