Chalk Point
PJM queue ID F08
Chalk Point (F08) is listed in the PJM interconnection queue as a 6 MW gas project in Prince George's County, MD. PJM lists its status as “In Service”, with a target commercial operation date of March 17, 2001.
| Queue ID | F08 |
|---|---|
| Project name | Chalk Point |
| Status (as published) | In Service |
| Substation | Chalk Point |
| Point of interconnection | Chalk Point 230kV |
| County | Prince George's |
| State | MD |
| Voltage | 230 kV |
| Capacity | 6 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2001-03-17 |
| Source dataset | serial |
Same substation and county
Chalk Point substation: 5 requests in the PJM queue, 2 active totaling 676.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-552 | Chalk Point 230 kV | 670.2 | Hybrid | Active |
| U2-081 | Chalk Point 230kV | 600 | Gas | Withdrawn |
| U2-083 | Chalk Point 230kV | 400 | Gas | Withdrawn |
| G35 | Chalk Point | 340 | Gas | Withdrawn |
Prince George's, MD: 57 requests in the PJM queue, 14 active totaling 3,551.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 6 |
| MW capacity | 6 |
| MFO | 20 |