Tap Wolf Switch - Quarry Field Switch Ckt 2 substation interconnection queue
2 active projects totaling 880 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Wolf Switch - Quarry Field Switch Ckt 2 as the point of interconnection, all in Ward County, TX.
Target commercial operation dates as filed run from May 2028 to Jun 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Permian Power I LLC (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0105 | Vast Sands Power I (TEF -Due Diligence) | 345 | 440 | Gas | SS Completed, FIS Completed, IA | May 2028 |
| 28INR0109 | Vast Sands Power II (TEF-Due Diligence) | 345 | 440 | Gas | SS Completed, FIS Completed, IA | Jun 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | 28INR0105 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
| 2026-10-05 | 28INR0109 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Other ERCOT queue substations in Ward County, TX
- Tap Coyanosa - Blair Lake Sub: 2 active, 605.3 MW of 2 filed
- TNSTAGHORN1: 2 active, 180 MW of 2 filed