Substation Scout

Ward, TX interconnection queue

13 active projects totalling 3,428.6 MW in the ERCOT queue.

13active projects
3,428.6active MW
13total filed
Queue IDProjectkVMWResourceStatus
25INR0008 BasRanch (TEF - Due Diligence) 345 1,350 Gas SS Completed, FIS Completed, IA
28INR0105 Vast Sands Power I (TEF -Due Diligence) 345 440 Gas SS Completed, FIS Started, IA
28INR0109 Vast Sands Power II (TEF-Due Diligence) 345 440 Gas SS Completed, FIS Started, IA
27INR0255 New Minglewood Energy Center 345 208.3 Battery SS Completed, FIS Started, No IA
23INR0075 BRP Rhine BESS 345 206.9 Battery SS Completed, FIS Started, No IA
23INR0094 BRP Pyxis BESS 138 206.9 Battery SS Completed, FIS Started, No IA
27INR0562 Frizzle BESS 138 180.9 Battery SS Completed, FIS Started, No IA
25INR0606 Proteus Thornton Ranch Solar SLF 138 180 Solar SS Completed, FIS Started, No IA
27INR0202 Shallow Valley Storage 138 103.4 Battery SS Completed, FIS Completed, No IA
24INR0538 FLIFER Solar I 138 84 Solar SS Completed, FIS Started, No IA
26INR0724 Monahans Power Gas 138 18.2 Gas SS Completed, FIS Started, No IA
26INR0698 Staghorn Gas 138 10 Gas In Queue
25INR0607 Proteus Thornton Ranch Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.